The refit
Always an exciting and scary adventure when you own a boat, especially if the boat is your home. Doing a refit on a live-aboard boat is like renovating your bathroom while you live in it. Lots of smells, dust, and carcinogenic chemicals.
Our adventure started on a lovely spring day, anchored in Port Graves. My friends Ron & Karen were aboard for morning café stupid's (coffee and Baileys) when Ron asked a simple question about the rigid vang. The pin looked a little small. That's all it took. A simple question about an innocuous pin kicked us off into a 3 year $50,000 refit.
We started with the hull. Angelique was finished in All Grip paint, as opposed to Gelcoat. Twenty three years later the All Grip was gone and we were looking at raw fiberglass in some locations. Jacquie and I wanted to refinish with All Grip as we liked the durability of the product and it had the colours we wanted. Unfortunately, All Grip can only be applied by a certified professional with a full oxygen breathing system. The paint contains cyanid.
I did a couple of months of research and landed on a product called Alex Seal. It had the colours we wanted and it could be installed by an amiture using roll & tip. We could afford this, so decision made.
It was fall by the time we bought the paint. So I spent the winter upgrading door latches, hatches, adding roller shades to the ports (great but holly shit expensive), painting the interior and demolishing the head liner. Its all a blur but I thing there were some AC/DC wiring jobs as well. I remember we changed the shore power and battery charger.
Spring arrived and we scheduled a month in Lions Gate Marina as they had a shed big enough to hold Angelique. But First, off to Lynnwood Marina to drop the rig at Protech who did an inspection (all good) and some upgrades to the spreaders and the spinnaker crane.
Once we got into the shed at Lions Gate we spent the first 2 days building an enclosure inside the shed to control dust. We needed to keep ours inside and the yards outside. Since it was early May we also needed heat. Alex Seal is an epoxy paint, 2 main parts as well as thinners and accelerators. It will not cure if the temperature is less than 15C (around 60F). So we added electric heaters to the enclosure.
Jacquie and I started sanding, preparing for multiple layers of primer and fillers. I have done lots of cars in my misspent youth and this stage ALWAYS hacked me off. You spend a lot of time and money to add a finish, and then you spend more time taking some of it off. Clean and repeat.
Three coats of primer and we were ready for paint. Our friend Ron (you remember, the guys who I mentioned earlier as starting all of this) was horrified by our first effort of roll and tip. I remember his words exactly. " No, no, no. Stop! This is a shit-show. I'll show you." We watched and tried a small spot. "Nope. Your not getting it. Your fired Mike. Jacquie can tip-off and I'll roll on"Half way through the second coat Jacquie was fired as well. While she was doing a great job, she was too slow. As I was not qualified to paint I did what all non-skilled labour does on a site. Go on a beer run.
Ron painted the 2 colours on Angelique's hull. Jacquie and I sanded between coats. The finished paint job looks fantastic. Thanks Ron!
Back to Lynnwood to pick up the rig, and home for a rest. Ha! No rest for the wicked. I built a bubble over our home and started in on the deck. Same sanding process as for the hull, except ALL of the deck gear has to come off. While we were at it we move the primary winches to a better location, rebuilt all of the winches, added new cars and blocks (all roller bearing Gerhauer, very sexy) and changed out the manual windlass for a new electric, complete with wash down. Oh, we also changed out the old boom vang, which was what started this whole shit show in the first place. Somewhere along the way I learned how to roll and tip. I think Jacquie thought me. We both painted our little brains out and had the decks finished for a fall cruise. All the new gear worked great. One last piece. A new hard top. We had wanted one of these but they are a ton of work, so we never started. Well, in for a penny, in for a pound. We started planning the hard top as a spring project. See our post for the details. What I thought would be a 3 week project took 4 months to complete.
Three years later we are very happy with the results. Would I do it again? Yes, but I would hire professionals and just do what I do best. Go get the beer.
SV Angelique of Vancouver is a Coast 34 owned by Mike and Jacquie Champion and our continuing adventures after 22 years of living aboard
Showing posts with label Boat Projects. Show all posts
Showing posts with label Boat Projects. Show all posts
Wednesday, August 16, 2017
Monday, April 10, 2017
Hard top
I thought it was time I spoke about the hard top. Why did we build it, and the story of the build.
We had a canvas dodger and Bimini for close to 20 years.
![]() |
| Sailing into San Francisco 2008 |
Over the years we covered the Bimini with solar panels, so the temporary nature of a canvas cover was lost. Also, the thread rotted out while we were in Mexico so we started thinking of a more permanent solution. I had admired the large hard tops most catamarans have, with lots of room for solar panels. They also seemed to be cooler than a canvas top in the tropical sun. Since we were already planning to repainted the hull and decks, I figured it would be easy enough to build a hard to as well. In theory this sounded ok to me. Jacquie said that in practice it sounded like a lot of work. Or a lot of money for someone else to do it. I'm cheap, so I talked her into helping.
Lots of YouTube videos later I knew I needed a pattern. So I talked Jacquie into making me one out of some cardboard boxes taped together. The pattern was a little rough but she was smart enough to tell me that it was ok to built the top without the kinks.
![]() |
| Jacquie and quality control |
| First layer of Nytech |
It took the entire month of March to glass both sides and to prep for the stringers. We were working in an unheated garage and on weekends. I need to keep working to pay for all of the materials after all. While Jacquie is retired I could not, try as I might, talk her into working on the top while I was at work. Something about the 5C temperatures and toxic fumes.
![]() |
| Structural Ribs |
As the weather warmed up we were able to get back on the top and add the 2x2 wood stringers, rolled edges and the fairing.
![]() |
| Jac sanding. What a gal! |
Seems my fairing left a lot to be desired. I was fired and relegated to assistant. Jacquie and Ron took over and fixed up all of my cosmetic kinks. Add another 100 man hours. At least we were getting somewhere now. It started to look like a top. Finally ready for paint. Or maybe not yet. My build was taking too long and Ron needed to demo the garage as part of rebuilding his house. We were relegated to the side yard, covered by an old show tent from Jacquie's summer markets.
It was around this time that Ron's wife Karen asked 'Are you going to take that down to the boat for a test fit? We test fit our hard top 3 times to make sure it fit.' I'm a bit of a gambler, and have total faith in Jacquie's ability to make a pattern. I simply replied ' Nah. It will be OK' and continued to cut out hatches and help Jacquie and Ron finish the fairing. Truth be told we were now in May and I just wanted to get the f#@&ing thing finished. If it didn't fit I was going to bin it.
![]() |
| Captain Ron fixing my mistakes. Thanks man! |
![]() |
| Test fit for hatches |
![]() |
| Mixing primer, finally. |
There was still about 100 hours of fairing before paint. I was REALLY starting to hate this thing. But Jacquie pushed me on and we started prepping for paint.
We decided on Alex Seal for finish. Its a lot like All Craft without the cyanide. So I could apply wearing a simple respirator. We also wanted a product that could be repaired. The Alex Seal product can be applied with a roller and finished off with a brush. We used the same product on the hull and decks with fantastic results. We applied 3 coats of primer, polishing between coats. More sanding, all by hand with 300 grit. Wax on, wax off.
![]() ![]() |
| Primer! Finally some paint! |
Its now June and I am painting on my own. Jacquie is off to her summer markets. I have a deadline to have the top on the boat for July. Get painting boy!
![]() |
| First side done |
| Final coat done! Shinny!!!! |
![]() |
| Loaded for transport |
We decided to haul out at Lions Gate Marine to install the top. They have a great yard and were willing to use the forklift to place the top. We used the transport frame, which was made from the work deck, to build the temporary cribbing on the boat. Waste not want not. We took down the backstay and had the top lifted into place. Does it fit? Will the backstay run through the hole in the top?
![]() |
| It fits! time to strap it down |
Stunned shock. It fits perfectly! All from a cardboard pattern Jacquie cut out over 6 months earlier. I love that woman!
The top looks gorgeous! The yard owner asked who made the top for us. 'We did' was a happy response. He looked confused, then smiled. You know the kind. The kind that says 'oh sure you did'.
Add the name back on and we are ready to splash.
![]() |
| Only 2 years after the paint job. Looks great! |
There was a 4 foot chop in the bay on launch day. We were terrified that a strap would fail, the top would crack, or the crib would fail and all our effort would sink into English Bay.
A tense 2 hours later and we were safely home. We had already met Roy "The Welder" at Lions Gate. He had a great plan to anchor the top on 4 2" SS posts. Jacquie had a sketch for a new radar arch, so Roy was off to his shop. He worked fast! A little over a week later all of the steel was installed and Roy was wrapping up some field welds.
| Metal installed, cribbing going out. |
| Running cable. Wow that's shinny! |
| Time for canvas! |
| Canvas and solar panels |
I tried to get Jacquie to do the canvas again. She has a Sail Rite walking foot machine after all. No joy. I used up all my credit with the sanding, painting, sweating, and lifting. "Call Denise at North Sails. I am NOT sewing any more cockpit enclosures!' The admiral had spoken.
A quick call and North Sails in September and the canvas was on before Christmas. Another 2 weeks and I had the solar panels installed. So only 12 months to build a hard top to mount solar panels on.
On time? Nope. On budget? Nope.
Happy owner. YUP!
![]() |
| Finished at long last! |
Subscribe to:
Posts (Atom)













